Northgate Industrial Park
Sacramento, CA
Status: Completed
Use: Industrial and Commercial Space
Size: 156,013 square foot Climate Controlled Commercial Warehouse
Project Overview
Northgate Industrial Park is an industrial adaptive reuse and redevelopment project located in Sacramento, California. The project transformed the former Fry's Electronics property into a modern industrial facility, including the adaptive reuse of the existing 156,013-square-foot retail building into flexible warehouse space.
Located on a 10.36-acre site at Northgate Boulevard and Interstate 80, the redevelopment provides convenient access to Sacramento International Airport, major distribution corridors, and regional freight infrastructure. The larger redevelopment is planned to accommodate both single-tenant and multi-tenant industrial users through flexible warehouse layouts and shared site infrastructure.
Client: LaTerra Development
LT Building Corp's Role: Construction Manager & Owner's Representative
Project Highlights
Managed the adaptive reuse of a 156,013-square-foot former Fry's Electronics retail building into a modern industrial warehouse facility.
Oversaw significant building and site improvements across the 10.36-acre industrial property.
Coordinated complete interior demolition, structural modifications, new roofing, loading dock installations, storefront improvements, and extensive building modernization.
Managed comprehensive civil site improvements, including new drive aisles, parking, utilities, storm drainage, landscaping, lighting, and paving.
Successfully completed the adaptive reuse project within 12 months and under budget.
Managed an approximate $6.1 million construction hard cost.
Project Features
10.36-acre industrial redevelopment
156,013-square-foot adaptive reuse warehouse conversion
Flexible warehouse space designed for single-tenant or multi-tenant occupancy
New TPO roofing system
New loading dock doors and grade-level access
Structural modifications for new storefronts and roll-up doors
New aluminum storefront systems with decorative steel awnings
LED lighting upgrades
Complete interior demolition and building modernization
Sealed concrete warehouse floors
New concrete drive aisles, curbs, and gutters
Storm drainage improvements
Parking lot reconstruction and striping
New landscaping and irrigation
Excellent visibility along Interstate 80
Convenient access to Sacramento International Airport and regional freight corridors
Construction Approach
LT Building Corp served as Construction Manager and Owner's Representative for the adaptive reuse phase of the Northgate Industrial Park redevelopment. Acting as the owner's advocate, the team provided leadership throughout preconstruction and construction, managing budgets, schedules, contractor coordination, quality assurance, and site improvements.
The adaptive reuse required extensive modification of the former retail building, including complete interior demolition, structural alterations, roofing, loading docks, storefront systems, and building modernization. LT also coordinated comprehensive civil improvements across the 10.36-acre site, including utilities, drainage, paving, parking, landscaping, and lighting. The adaptive reuse project was successfully completed within 12 months and under budget.